DELIVERY, INSTALLATION AND COMMISSIONING OF THE 31.5 MVA 110/36.75/6.3 kV SPECIAL TRANSMISSION TRANSFORMER

Project was commissioned by the Kosovo Energy Corporation.

Works included

  • Working with KEK to prepare the technical specifications for the transformer that was being replaced. This included the working specifications as well as the physical dimensioning for the transformer by calculating all limitations that the location had.
  • Old transformer removal and site preparation. The old transformer to be removed had over 140 metric tons which needed to be removed to a storage area of KEK. After removal, site had to be prepared for the new transformer.
  • Delivery of the transformer was done in time according to the dynamic plan presented to KEK. Transformer delivered together with bushings, buchholz relays, oil and temperature indicators.
  • Installation of the transformer. Putting the transformer into place, installing all I&C equipment and starting up. All done by EKOINVEST engineers.
  • Category

    Electrical
  • Client

    Kosovo Energy Corporation J.S.C
  • Partner

    KonĨar D&ST
  • Location

    TPP Kosovo A, Obilic